Welding the Frames |
||
![]() |
||
| Here is the initial placement of the aft area of the frames. Spacing is 18 inches on center. Below is where the batteries and motor will be. |
![]() |
||
| Looking from the stern to the bow. All the frames are hanging from above, along a straight line. The "T" bars which the frames are hanging on are temporary and are used to align everything. On the top of the "T" bars are welded a threaded rod so that each frame can be adjusted up or down. |
|
||
| Here are the frames just after fabrication. Top and bottom had to be constructed separately to gain access to the interior area for plastering. |
![]() |
||
| Here is the bow section with the "T" bars. |
![]() |
||
| Frames ready to be connected together with wire. |
![]() |
||
|
Electric submersible with articulating entry |
||
![]() |
|
|
| ESMAE |